
Collegeside Child Care Centre – Sheridan College Davis Campus, Brampton
This new 6,000 sq.ft. child care and cooperative learning facility required the relocation of several mature maple trees prior to the start of construction. The building consisted of a combination of masonry and stucco construction with structural steel framing and metal roof deck.